
03 / Products
Products
Representative parts by industry and material. Every part is built to the customer’s drawing.

Vacuum Chamber Block
Process chamber body for etch and deposition tools. Large aluminum billets…
- Material
- A6061-T6
- Tolerance
- ±0.01 mm
- Lead time
- 3 – 4 weeks

Gas Manifold Block
SUS316L manifold for process gas distribution. Intersecting deep holes, in…
- Material
- STS316L (VIM-VAR available)
- Tolerance
- ±0.01 mm
- Lead time
- 3 weeks

Wafer Handling End Effector
End effector for 300 mm wafer transfer robots. Thin, long geometry is stab…
- Material
- ESD PEEK / A6061-T6
- Tolerance
- ±0.02 mm
- Lead time
- 2 – 3 weeks

Battery Cell Stacking Jig
Alignment jig for pouch cell stacking machines. High-strength A7075 with h…
- Material
- A7075-T651
- Tolerance
- ±0.01 mm
- Lead time
- 2 weeks

Electrode Notching Guide Block
Guide block for electrode notching dies. Ground and wire-cut after hardeni…
- Material
- SKD11 / D2 (HRC 58 – 60)
- Tolerance
- ±0.005 mm
- Lead time
- 3 weeks

Roll Press Bearing Housing
Bearing housing for electrode calendering roll presses. Quenched and tempe…
- Material
- SCM440 Q&T (AISI 4140) / S45C
- Tolerance
- Bore H6 (+0.016 / 0)
- Lead time
- 3 – 4 weeks

Battery Pack Cooling Plate Prototype
EV battery pack cooling plate prototype. Channel machining, friction stir …
- Material
- A6063 / A3003
- Tolerance
- ±0.05 mm
- Lead time
- 2 – 3 weeks

EV Drive Motor Housing Prototype
Drive motor housing prototypes machined from billet, supplying validation …
- Material
- A6061-T6 billet
- Tolerance
- Bearing bore ±0.008 mm
- Lead time
- 3 weeks

Steering System Bracket Prototype
Steering mount bracket prototypes. Hole positions and datums are machined …
- Material
- STS304 / 17-4PH
- Tolerance
- ±0.02 mm
- Lead time
- 10 business days

Robot Reducer Flange
Output flange for industrial robot joint reducers. Face parallelism and ce…
- Material
- S45C Q&T / SCM440
- Tolerance
- ±0.005 mm
- Lead time
- 2 – 3 weeks

Linear Stage Base Plate
Base plate for precision linear stages. Rail mounting faces are finish-mac…
- Material
- A6061-T651 / A5052
- Tolerance
- ±0.01 mm
- Lead time
- 2 weeks

Engineering Plastic Insulator Block
Insulating blocks for electrical isolation and heat resistance inside equi…
- Material
- ULTEM (PEI) / POM / MC nylon / PTFE
- Tolerance
- ±0.02 mm
- Lead time
- 7 – 10 business days
* Tolerances and lead times reflect representative jobs and vary with geometry and quantity.
Send us a drawing.
We reply within 24 hours.
PDF, STEP, DWG or IGES. From a single prototype to monthly production volumes.